Week 2: Rethymno ARCHELON
Day 9: On Sunday 18th September I had my first morning survey on beach G-K with David, we were driven at 6:10am to the end of K beach, dropping off Matthew and Lieke at D beach who would walk to F and meet us there when we both finished. Once we had taken taken sea level measurement at K beach we then walked towards G, a lot of J and I are completely gone because of Coastal erosion so we made it to the end quicker than Matthew and Lieke made it to F. David and I had two excavations to do along the way, with one live hatchling in one of the nests which we had to assist to sea but which made it which was good. David and I carried on and surveyed beach F for Lieke and Matthew and met them around the hatchery area where a lot of nests were relocated too, where they were assisting two hatchlings to sea and completing an excavation. Once they were done we were then picked up in the car and taken back to camp. That evening I had another public excavation outside creta star hotel, which had